Click on an icon above to learn about projects on that road.
Tampa Airport Interchanges -- SR 60 (completed March 2010)
Project Description
Financial Project # 255844
Project Length: 3 miles
Estimated Construction Cost: $230 million
Contractor: Flatiron-Tidewater Skanska, a Joint Venture
Start Date: August 15, 2005
Completed: March 31, 2010
About this Project
The Florida Department of Transportation (FDOT) has completed improvements to State Road 60/Memorial Highway from I-275 to the Courtney Campbell Parkway interchange, in the vicinity of Tampa International Airport (TPA). The project also extended west one mile onto the Courtney Campbell Parkway (S.R. 60) and north to the Veterans Expressway (Toll 589). This entire project was known as the Tampa Airport Interchanges project. See map.
The Spruce Street/S.R. 60 interchange was improved to a four-level interchange and the Courtney Campbell/S.R. 60 interchange was improved to a three-level directional interchange. This configuration eliminated S.R. 60 traffic signals within the Courtney Campbell interchange and on the causeway at the Hyatt entrance (Bayport Drive). It also provided a two lane frontage road system for access to the Hyatt property. The new interchange configuration features the separation of local and express traffic with collector/distributor (C/D) roads and express lanes. This system is also expected to help reduce congestion on the interstate ramps within the area and improve access to Tampa International Airport.
Directions out of TPA to connecting roads:
To help get you out of Tampa International Airport and make the connection to major roads, we have step-by-step maps to guide you:
Click here to go to the directions page.
"Before & After" Aerial Photos
To get a view of the dramatic changes that were constructed to this roadway system, click here to view pre-construction aerial photos along with computer-enhanced versions of these photos that show artist renderings of the improvements.
Aerials (straight down views) | Photos (various views) |
Presentation Board View of the Project
For another view of the area, click here to view presentation boards of the entire project area.
"Drive-Through" Video
We also offer a computer-enhanced "driving" video of what the completed project looks like (made prior to construction). This video takes you through many of the driving movements that are now in place. Click here to view the video.
Lane Closure Hours were
State Road 60
* Single Lane: 8:30 p.m. to 5:30 a.m.
* Double Lane: 11 p.m. to 5 a.m.
Spruce Street
* Single Lane: 8:30 p.m. to 5:30 a.m.
* Double Lane: 11 p.m. to 5 a.m.
George Bean Parkway
* 11 p.m. to 6 a.m.
State Road 589 (Veterans Expressway) Northbound
* Single Lane: 8:30 p.m. to 5:30 a.m.
* Double Lane: 11 p.m. to 5 a.m.
State Road 589 (Veterans Expressway) Southbound
* Single Lane: 8:30 p.m. to 5 a.m.
* Double Lane: 11 p.m. to 5 a.m.
Night Detours
* 10:30 p.m. to 4:30 a.m.
Recent Project Photos
Interactive Maps
- Tampa Airport Interchanges Aerial Photos
Maps
- Project limits: Tampa Airport Interchanges
- Frontage Road closure and detour map
- New ramp configuration exiting Tampa International Airport
- Eastbound SR 60 / Southbound Memorial Highway traffic shift
- Map of October 7 traffic switch for Eastbound SR 60 exit to TIA
- New ramp / signal removal to improve traffic flow
- Map of December 8, 2008 traffic shift on Courtney Campbell
- Map of new ramps opening in December 2008 near Tampa International Airport
- New connection from Tampa International to southbound Interstate 275
- Changes in place for Tampa International Airport and Spruce Street entering WB SR 60
- New Courtney Campbell ramp opens November 9th
- Detail map view of new Courtney Campbell Ramp opening November 9
- Final Traffic Patterns
Fact Sheets
- Tampa Airport Interchanges Fact Sheet
- Frontage Road Closure (January 2007)
- W. Frontage Road Closure Information (October 2007)
- East Frontage Road closure (May 2008)
Driving Directions
- Map A: to St. Petersburg, St. Pete Beach, Tropicana Field via southbound I-275
- Map B: to Ybor City and Orlando via northbound I-275 to eastbound I-4
- Map C: to downtown Tampa, St. Pete Times Forum, and Channelside via northbound I-275
- Map D: to Veterans Expressway (Toll 589)
- Map E: to Clearwater and Clearwater Beach via westbound SR 60
- Map F: to Raymond James Stadium via Spruce Street
Related Projects (FDOT)
Southbound I-275 exit to westbound SR 60 may be closed at night
Posted 4/15/2016 8:00:00 AM
Left turn lanes reopened on Thonotosassa Road, south of I-4
Posted 4/15/2016
Night lane closures on I-75 in upper Pasco County
Posted 4/20/2016