I-275 Resurfacing from Howard Frankland Bridge to SR 60 Exit (completed September 2014)
Project Description
Financial Project Numbers: 428966-1
Project Limits: East end of Howard Frankland Bridge to SR 60 exit ramp
Project Length: 1 mile
Construction Cost: $1.6 million
Contractor: Preferred Materials Inc.
Contract Start Date: March 14, 2014
Construction Start: March 27, 2014
Completed: September 5, 2014
About this Project
The Florida Department of Transportation's (FDOT) contractor milled and resurfaced both directions of Interstate 275 from just off the east end of the Howard Frankland Bridge to the State Road 60 exit (Kennedy Boulevard/Memorial Highway). The resurfacing also included the bridge service roads.
Traffic Flow
All work on the travel lanes took place during night hours when traffic volume was reduced. All mainline travel lanes were scheduled to remain open on I-275 during peak traffic hours.
Lane Closure Hours
Single lane: 10:00 p.m. to 5:30 a.m.
Two lanes: 11:30 p.m. to 5:00 a.m.
Contact Person(s)
Public & Media Contact
John McShaffrey, APR
Interstate Construction Office
(813) 975-6930
Southbound I-275 exit to westbound SR 60 may be closed at night
Posted 4/15/2016 8:00:00 AM
Left turn lanes reopened on Thonotosassa Road, south of I-4
Posted 4/15/2016
Night lane closures on I-75 in upper Pasco County
Posted 4/20/2016