I-75 Widening from north of County Road 54 to north of State Road 52
Project Description
Financial Project Number: 258736-2-52-01
Project Limits: On I-75 from north of County Road 54 to north of State Road 52. On State Road 52 from west of Old Pasco Road to east of Corporate Lake Boulevard.
Project Length: 6.7 miles on I-75; 1.6 miles on State Road 52
Estimated Construction Cost: $71.8 million
Contractor: Prince Contracting, LLC.
Contract Start Date: November 18, 2013
Construction Start: May 29, 2014
Estimated Completion Date: Spring 2017
About this Project
The Florida Department of Transportation's (FDOT) contractor is widening Interstate 75 from the existing four lanes to six lanes (3 in each direction) from north of County Road 54 to north of State Road 52 in Pasco County.
The project includes adding lanes in each direction, resurfacing the existing lanes, extensive drainage construction, overhead signing, and high mast lighting. When finished, there will be three 12-foot wide lanes in each direction.
The State Road 52 interchange will remain a diamond shaped interchange with one exception: A loop ramp will be added to the interchange for westbound SR 52 traffic entering southbound I-75. Ramp intersections will have traffic signals to assist with traffic flow entering and exiting I-75.
There will be extensive reconstruction of SR 52 at I-75, from west of Old Pasco Road to east of Corporate Lake Boulevard, where this section will be built to a six-lane roadway that transitions to the existing roadway outside of these limits. Frontage roads will also be constructed on both the north and south side of SR 52, west of I-75.
Bicycle and pedestrian accommodations will be provided in both directions (eastbound and westbound) of SR 52, including on-street bicycle lanes. Standard sidewalk will be built on the south side and a 10-foot wide sidewalk will be provided on the north side.
PROJECT GRAPHICS
View of the project on presentation boards
Click here to view the boards
Improvement Highlights
- Widen the interstate from 4 to 6 lanes.
- Add a westbound SR 52 loop ramp onto southbound I-75.
- Improve drainage.
- Tie in to the completed interstate project north of the County Road 54 interchange.
- Widen SR 52 to six lanes (.8 miles on each side of I-75).
Traffic Flow
The construction phasing is designed so that all existing lanes of traffic and interchange ramps will be open on I-75 during peak traffic hours.
Night Work
In order to maintain the construction schedule and to minimize the impact to the traveling public, lane closures and construction work are planned for nighttime hours.
Lane Closure Hours: 9:00 p.m. to 6:00 a.m.
Contact Person(s)
Public & Media Contact
John McShaffrey, APR
Interstate Construction Office
(813) 975-6930
Log in to see if you are subscribed to receive updates on this project.
"Latest Project Updates
Night lane closures on I-75 in central Pasco County
Posted 4/15/2016
Night lane closures on State Road 52 in the I-75 area
Posted 4/15/2016
View all news for this project
Interactive Maps
- Project Area Map
Fact Sheets
Related Projects (FDOT)
- Other FDOT I-75 Projects
- Other FDOT Hillsborough County Projects
- Other FDOT Pasco County Projects
- Other FDOT Hernando County Projects
- Other FDOT Hillsborough/Pasco County Projects
- Other FDOT Tampa Bay Area: FDOT District 7 Projects
- Other FDOT Hillsborough County/Pasco County Projects
- Other FDOT Pasco/Hernando/Sumter counties Projects
Southbound I-275 exit to westbound SR 60 may be closed at night
Posted 4/15/2016 8:00:00 AM
Left turn lanes reopened on Thonotosassa Road, south of I-4
Posted 4/15/2016
Night lane closures on I-75 in upper Pasco County
Posted 4/20/2016