(256994-1and-2_graphic_11-24-09_1000web.jpg)
This drawing shows the work area for this project. The areas in gold are bridges; roadway construction is in pink. I-275 is shown in the lower right corner. The project ends on the left side of the diagram on County Road 296 (118th Ave.) east of 40th Street North.