Project map


(256994-1and-2_graphic_11-24-09_1000web.jpg)

This drawing shows the work area for this project. The areas in gold are bridges; roadway construction is in pink. I-275 is shown in the lower right corner. The project ends on the left side of the diagram on County Road 296 (118th Ave.) east of 40th Street North.

Close Window